The Cas di Cultura renovation team has added lyongo architecture as lead project managing architect for E Brasa, according to a November 24 report by 24ora. The firm will work with local architect Jouel Croes and a multidisciplinary group of specialists.
Design coordination moves forward
A preliminary design by Croes Architecture Studio-Cast forms the basis for the next phase. The team includes Thijsen Engineering & Consultancy, Time Line Services, TheaterAdvies and Acoustic Reflections, bringing together engineering, technical-installation, theatre-design and acoustic expertise.
Heritage and modern facilities
Plans aim to balance the building’s architectural heritage with updated facilities, including a modern theatre hall and improved spaces for dance and music education. These are design aims, not a completed building or a final approved design.
Recent Aruba consultations reviewed proposed plans and technical considerations. Further refinement is expected over the coming weeks, with additional consultations anticipated in early 2027, the report says.
Source: Read the original 24ora report.
Image: Original conceptual editorial illustration, not a documentary photograph of the reported people, place or event.



















